A Practical Application of FMEA for IT Project Prioritization : a Case Study at Manufacturing Company

Diena Novitasari, Komarudin Komarudin, Akhmad Hidayatno

Abstract


This research aims to develop a method for information technology (IT) project prioritization that is very easy for a user through a case study in a manufacturing company. This research
used descriptive qualitative research based on survey data from unstructured and semistructured interviews with system development managers. Furthermore, the applicability of the developed method is assessed. A combination of importance analysis and risk analysis using failure mode and effect analysis (FMEA) is useful and applicable to this company. The risk that is considered in this study is the risk of a delayed project for the company. This study contributes to the relevant literature by proposing a very applicable IT project prioritization method.

Keywords: IT Project Prioritization, Risk Analysis, FMEA, Importance Analysis


Full Text:

PDF

Refbacks

  • There are currently no refbacks.



Proceeding International Conference on Information Technology and Business (ICITB) is abstracting and indexing in the following databases:


PROCEEDING INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND BUSINESS

Managing By: Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM)

Publisher: Institut Informatika dan Bisnis Darmajaya
Address: Jl. Z.A. Pagar Alam No. 93 Gedong Meneng, Bandar Lampung Lampung
Website: jurnal.darmajaya.ac.id

Email: ProceedingICITB@darmajaya.ac.id


 

Creative Commons License

IC-BITERA is licensed under a Creative Commons Attribution 4.0 International License.